Aug 2005: Atrazine Trace

Sep 2005: Endosulfan 0.0007ug/L (average), Atrazine 0.014ug/L

Oct 2005: Atrazine 0.034ug/L

Nov 2005: Endosulfan 0.0015ug/L (average), Atrazine 0.039ug/L

Dec 2005: Atrazine 0.062ug/L

Jan 2006: Atrazine 0.038ug/L

Feb 2006: Endosulfan 0.0007ug/L (average), Atrazine 0.048ug/L

Mar 2006: Endosulfan 0.0015ug/L (average), Atrazine 0.027ug/L

Apr 2006: Atrazine Trace

Source: Pesticide Monitoring in Goulburn Murray Water’s Irrigation Supply Channels Covering the Six Irrigation areas [2004-2006 Irrigation Season Study Report: Interim Report June 2006. Goulburn Murray Water

2005 August – 2006 April: Burramine region Yarrawonga Drain (Vic). Pesticides detected: Atrazine, Endosulfan.

Aug 2005: Atrazine Trace

Sep 2005: Endosulfan 0.0007ug/L (average), Atrazine 0.014ug/L

Oct 2005: Atrazine 0.034ug/L

Nov 2005: Endosulfan 0.0015ug/L (average), Atrazine 0.039ug/L

Dec 2005: Atrazine 0.062ug/L

Jan 2006: Atrazine 0.038ug/L

Feb 2006: Endosulfan 0.0007ug/L (average), Atrazine 0.048ug/L

Mar 2006: Endosulfan 0.0015ug/L (average), Atrazine 0.027ug/L

Apr 2006: Atrazine Trace

Source: Pesticide Monitoring in Goulburn Murray Water’s Irrigation Supply Channels Covering the Six Irrigation areas [2004-2006 Irrigation Season Study Report: Interim Report June 2006. Goulburn Murray Water